I had a meeting in the morning, discussing sampling locations off base. I think that there are still a couple of issues, which need to be worked out. I will develop a minimum and a maximum version and see, how much will be possible. Everybody is really helpful here, but I do not want to stretch things. The GC is fine, but before starting up I called in the electricians – just in case With the column installed I started equilibrating once all gas cylinders had arrived. Everything looked fine after a few shutdowns of the detector – which I could fix easily. Tomorrow will be “testing day”.